| New and Improved
for 2009 After this last snowfall we know everyone is anxiously awaiting the warm weather and anticipating opening day at Greenwood Park. For those of you who can’t wait to step through the main gate, we would like to give you a sneak preview of what’s waiting for you! We have made a major improvement to the picnic area where the new canopy stands. Two new retaining walls have been installed, allowing us to level out the slope, create two level picnic areas, and give everyone more room to comfortably enjoy their days at Greenwood Park. We invite you to view the pictures showing the process and finished project that awaits your enjoyment this summer.
|
![]() Marking It Out |
![]() Digging It Out |
![]() Trench for Lower Wall |
![]() Trenching Lower Wall |
![]() Barry Roberts at Work |
![]() Laying the Foundation |
![]() Ready to Lay the Blocks |
![]() First Course Lower Wall |
![]() First Course Upper Wall |
![]() Lake View of Work in Progress |
![]() Lower Wall Taking Shape |
![]() Upper Wall Taking Shape |
![]() Top View of Both Walls |
![]() Fill Dirt to Level Grade |
![]() Turn at Shed Area |
![]() Turn at Opposite End |
![]() Lower Wall Turn |
![]() Caps at Lower Wall |
![]() Upper Wall with New Grade
|
![]() A Beautiful View from the Lakeside
|
![]() Closer Look |
![]() A Beautiful View from the Shore |